Skip to content

New look. Same us. We’ve redesigned our site to make it easier to find what you need.

Latest

Get in touch

Are Facilities Management Employers Accidentally Training Talent for Their Competitors?

The facilities management skills shortage may not be entirely external. Discover why many organisations already have strategic FM capability within their teams, and what they can do to retain it.

Topics: Hiring & Leadership

October 28, 2026

1 min read

Many facilities management (FM) employers are giving their people the strategic experience the market now pays for, then leaving it unrecognised. Our 2026 data suggests that experience is increasingly being realised elsewhere, and that the most cost-effective senior FM hire may already be on the payroll.

Joined from LinkedIn? Click here to continue where you left off.

When a senior FM search stalls, the explanation most employers reach for is a skills shortage. That shortage exists in parts of the sector, and we return to it later in this article. Our 2026 Salary, Rewards & Sentiments survey, however, suggests part of the problem sits inside organisations themselves.

Over recent years, senior FM roles have taken on carbon reporting, data, workplace strategy and closer scrutiny of cost. That work is often given to people already in post, as an extension of their existing role. Our data shows it is rarely recognised in pay or title. When those same people move, they take that experience with them, and a move pays them far more than growth in place does.

In this article, we look at how FM roles are growing, what that growth is worth on the open market, and how hiring managers can build and keep the strategic capability they need.

How Senior FM Roles Grow Without Being Re-graded

Most of what a senior FM role involved a decade ago is still part of the job. What has changed is the amount bolted on to it, with every new demand on the estate arriving as an extra responsibility for the same post.

Compliance

  • Built around: statutory checks completed on schedule.
  • Now also expected: accurate asset data and digital audit trails.
  • Driven by: Building Safety Act enforcement. Fewer than one in six FM professionals trust their asset register completely (SFG20, 2026).

Cost

  • Built around: delivering services within budget.
  • Now also expected: showing value through whole-life cost and cost avoidance.
  • Driven by: budget pressure, the top challenge for three in four FMs in 2025 (SFG20).

Sustainability

  • Built around: running plant efficiently.
  • Now also expected: leading retrofit, owning carbon data and making the financial case for it.
  • Driven by: boards asking for reliable carbon figures before they release funds (CBRE).

Technology

  • Built around: operating the CAFM and BMS.
  • Now also expected: connecting sensors, analytics and predictive maintenance, and judging data quality.
  • Driven by: faster rollout of smart FM technology (CBRE).

Workplace

  • Built around: keeping space clean, safe and available.
  • Now also expected: shaping services around utilisation and employee experience.
  • Driven by: hybrid working, and occupiers judging space by how well it is used (CBRE).

Put the ‘now also expected’ lines together and you have the strategic FM leader that many briefs now describe. Put the ‘built around’ lines together and you have the role that many job descriptions, pay bands and interview processes were originally designed for.

Skills and responsibilities that are now expected usually arrives one project at a time. A Facilities Manager is asked to pull together the carbon data for the annual report. Then to lead the sensor pilot. Then to sit on the net zero steering group. Each addition is reasonable. Taken together, they amount to a different and more senior job, done at the original grade.

What the Market Pays for That Growth

Our survey shows how differently the market values a growing role depending on where the growth is recognised.

Reasons for Pay Rises in UK Facilities Management

The routes through which UK FM professionals receive pay rises and the average uplift associated with each.

Cost of living adjustments (11% of rises, averaging 2.0%) are not shown. The contrast between the first and third rows is the heart of the issue. When an FM professional’s responsibilities grow inside their current organisation, the average reward is 5%, and only 4% of pay rises come that way at all. When the same experience is taken to a new employer, the average uplift is 19.6%.

Put simply, the organisation that develops the capability often isn’t the one that benefits from it. It has invested the projects, the exposure and the management time. The next employer receives a candidate with a proven strategic track record and pays the market rate for it.

The movement data fits this pattern. 58% of FM professionals expect to change jobs in 2026, and many of them have no complaint about how their employer treats them: at least 27% of the whole profession is both content and preparing to leave. The average FM professional has been with their employer for 4.2 years, and 31% for two years or less. Many of them could have simply outgrown a role whose title and pay stood still while its scope expanded.

For hiring managers, this reframes the question. Some of the strategic FM capability you are trying to recruit may already exist in your team, built on your own projects. The cost of recognising it is likely to be lower than the cost of replacing it.

Facilities Management Career Progression: Operational and Strategic Paths

This article explores how senior FM careers are evolving, the differences between operational and strategic leadership roles, and the skills employers increasingly value when hiring future FM leaders.

Read the full article

The Skills Shortage Is Real, but Narrower Than It Looks

None of this means the FM talent market is easy. Building safety enforcement has pushed up demand for technical and compliance specialists, and CBRE calls the UK skills landscape fractured, with new talent needed in engineering and FM careers.

However, it helps to separate two different problems. The first is a shortage of people with specific technical skills, such as building services engineers. That takes training pipelines and apprenticeships to fix, and it takes years. The second is a shortage of people who combine compliance, cost, carbon, data and workplace expertise in one person, at one salary, ready on day one.

The second problem is the one most senior FM hires run into, and it has different solutions. Plenty of FM professionals are strong in compliance. Plenty understand energy. A growing number use data well. What’s scarce is all of it together. Employers who wait for that complete combination can find their search runs long, while capable candidates with most of the profile accept roles elsewhere.

This is where the internal picture matters again. If roles in your own team have been quietly absorbing strategic work, you may already have people with three or four of those capabilities. Developing the remainder, and building the team around each person’s strengths, is often faster than finding the complete candidate on the open market.

Looking beyond FM itself widens the field. Energy management, workplace consultancy, asset management and service provider account roles all produce people who hold part of the strategic profile and are keen to build the rest.

What Keeps FM Talent: Recognition, Flexibility and Reward

If growth in place is going unrewarded, the natural response is to pay more. Pay matters, and an underpaid FM professional is unlikely to stay. But our data suggests salary alone is not what holds people.

Recognition Comes First

69% of UK FM professionals feel valued or very valued at work, and 23% feel undervalued. Among those who feel valued, the main reasons are:

Average reasons for feeling valued, UK Facilities Management

Recognition and a good manager account for 70% of answers. This is where unrecognised role growth does the most damage. An FM leader who delivers a retrofit, rebuilds an asset register or reduces reactive spend has done strategic work. If the organisation still describes, measures and credits them only as an operations manager, the work goes unseen by the people who matter to their career.

Flexibility Is Close to Non Negotiable

92% of FM professionals work hybrid or fully flexible, averaging 2.2 days a week on site, and 38% have complete flexibility. Asked how they would react to being required in for more days, 45% said very negatively and 36% somewhat negatively. For a profession tied to physical buildings, that’s a striking result, and employers considering tighter attendance rules may want to weigh the retention risk carefully.

Long Term Reward Is an Untapped Lever

67% of FM professionals are satisfied with their benefits and 14% are not. Pensions (82%), bonus eligibility (71%) and car allowances (69%) are standard. Only 11% have access to a long term incentive or share scheme. For senior strategic hires, a long term incentive is one of the few levers that most competitors aren’t yet using, and it rewards exactly the multi-year results strategic FM work produces.

Hiring for Evidence of Change, Not Length of Service

Many FM hiring processes were designed when the role was mainly operational, and have been carried forward since. Job descriptions gain a paragraph on ESG and a line on data, but candidates are still screened on years in FM, sites managed and sector match. Interviews tend to explore how a candidate handled incidents, which is fair, but tests only one side of the role.

A more useful approach is to assess what a candidate has changed. The same framework works for internal talent reviews, which is where the opportunity described above begins.

Compliance and Information Governance

  • Strong evidence: led an asset register or golden thread clean up with a measured result.
  • Ask: “Our asset data is incomplete. What would your first 90 days look like?”
  • Who could assess it: the current Head of FM or compliance lead.

Commercial Judgement

  • Strong evidence: reduced a cost line or moved spend from reactive to planned.
  • Ask: “Here is last year’s FM budget. Where would you look for savings without adding risk?”
  • Who could assess it: a finance business partner.

Carbon and ESG Delivery

  • Strong evidence: delivered a retrofit or energy programme and reported the savings.
  • Ask: “How would you build the business case for this plant replacement?”
  • Who could assess it: the sustainability lead.

Data and Technology

  • Strong evidence: specified or connected CAFM, BMS or sensor systems and acted on the output.
  • Ask: “Tell us about a time the data was wrong. How did you know?”
  • Who could assess it: an IT or data lead.

Workplace Experience

  • Strong evidence: reshaped services around utilisation or employee feedback.
  • Ask: “Friday attendance here is well below midweek. What would you change?”
  • Who could assess it: an HR or workplace lead.

Stakeholder Influence

  • Strong evidence: secured budget or changed a decision at senior level.
  • Ask: “Explain a maintenance priority to our CFO in two minutes.”
  • Who could assess it: a board member or the COO.

Three principles make this work well. Ask for numbers, since a candidate who can attach a figure to their impact has usually owned it. Include people from outside property on the panel, who can spot a weak answer an FM interviewer might accept, and don’t expect all six at full strength. Decide which are essential for the role, which can be developed, and which the wider team already covers.

What Hiring Managers Can Do Next

Most of the following need no new budget line, but they do need a conversation between FM, HR and finance before the next senior hire.

  1. Review your current team before you recruit. Look for duties added since each person’s last re-grade, particularly carbon, data and workplace work. Recognising that growth is likely to cost less than replacing the person who carries it.
  2. Reward responsibility as it grows. Across the profession, just one pay rise in 25 comes from a role taking on more. An employer that breaks that pattern stands out to the people it most wants to keep.
  3. Hire for results. Start with the results the role must deliver in its first two years, then write the essential criteria from those, not from the last job description.
  4. Avoid paying for just the title. A brief with Director-level accountability competes with Director pay: £79,000 to £91,000 in London and the South East, and £67,000 to £74,000 in the regions. A Manager-level band (£53,000 to £61,000 in London) is unlikely to attract a candidate who has already done that work.
  5. Make strategic contributions impossible to miss. Recognising carbon, cost and workplace results in board papers and internal updates costs little and speaks to the main reason FM professionals feel valued.
  6. Treat flexibility as a retention strategy. With 81% of FM professionals likely to react negatively to more required office days, setting attendance by what the role genuinely needs, and saying so in the advert, can widen the shortlist.

Frequently Asked Questions: Are FM Employers Accidentally Training Talent for Their Competitors?

  • Why are FM professionals changing employers?

    FM professionals often change employers to secure higher salaries, broader responsibilities, better career progression and greater recognition for strategic contributions. Employers frequently struggle to match the market value of talent they have helped develop internally.

  • As facilities management roles become more strategic, professionals are taking on responsibilities in ESG, data, workplace strategy and commercial decision-making. When pay, titles and recognition do not keep pace with these additional responsibilities, retention becomes more difficult.

  • A strategic FM role goes beyond day-to-day building operations and focuses on areas such as asset performance, carbon reduction, workplace experience, cost optimisation, technology adoption and long-term estate planning.

  • Facilities management has evolved from a predominantly operational discipline to a strategic business function. Today's FM leaders are increasingly expected to contribute to sustainability goals, data-led decision-making, workplace strategy and organisational performance.

  • The most sought-after skills include compliance and building safety, asset data management, commercial and financial management, ESG and carbon reporting, workplace strategy, technology adoption and stakeholder engagement.

  • Future FM leaders are often identified by their ability to deliver measurable change, influence stakeholders, improve operational performance, manage risk, use data effectively and contribute to wider business objectives beyond day-to-day facilities management.

Are Facilities Management Employers Developing Talent for Their Competitors?

In many organisations, the honest answer is: in part, yes. FM roles are growing, and employers are giving their people the projects that build strategic capability. What’s often missing is the recognition, in pay, title and visibility, that would keep that capability in-house.

How Macdonald & Company Can Help

At Macdonald & Company, we help organisations hire senior FM talent from inside and outside the sector. We can benchmark your brief against the 2026 market, check whether the scope matches the salary, and introduce candidates whose experience fits the role you need now, not only the one you had before.

For employers unsure whether they have a hiring problem or a retention problem, external market insight can be invaluable. As a specialist real estate recruitment consultancy, we have visibility of the skills employers are demanding, the responsibilities candidates are taking on and the salaries being paid to secure them. That broader perspective helps organisations benchmark strategic FM roles more accurately, identify capability gaps realistically and recognise emerging talent that may already exist within their own teams.

Get in touch.

Partner with Macdonald & Company

Access to the best candidates starts with understanding the market. We work with real estate employers to provide insight, market intelligence and access to talent beyond their immediate networks.

Get in touch